Grassy Sound Fishing Pier Improvements Phase II
The Grassy Sound Fishing Pier, originally constructed in the early 1940s as a vehicular bridge, has served as a fishing pier since the early 2000s. However, after decades of exposure to the elements, it had significantly deteriorated. Our evaluation revealed widespread damage, including more than 60 piles with severe section loss and numerous broken supports,…
-
Grainger Northeast Distribution Center
Provided site design, sanitary sewer design, and air quality permitting for the new Grainger Northeast Distribution Center in Bordentown. Grainger, a leading distributor of industrial supplies, equipment, tools and materials, built its distribution center on 96 acres within the Central Crossings Business Park. The 1.4 million SF facility is the largest commercial warehouse in New…
-
Jersey City Government Annex
Our professionals provided comprehensive engineering and design services for the new three-story, 46,000 SF government annex in Jersey City, located on the corner of Kearny Avenue and Dr. Martin Luther King Avenue. City officials anticipated the annex bringing benefits to one of the City’s most economically distressed neighborhoods. The annex, planned adjacent to a shopping…
-
Gateway Expressway Design-Build
The Gateway Expressway design-build project will change the existing roadway system in Pinellas County in order to enhance safety, add capacity, and improve mobility by creating two new four-lane elevated tolled roadways. It was awarded to the Archer Western-de Moya JV team in the summer of 2017. With approximately 90 miles of roadway affected by…
-
Gas + Convenience Stores
Our team and Nouria have partnered on the redesign and rollout of their new, fully-branded fueling stations and service centers. Each travel center provides its community with unique efficiencies and high quality service. With a rough average of 6,000 square feet per unit, this family-owned regional chain purveys its own brand of fuel and coffee….
-
Frenchtown Open Space & Recreation Plan
Colliers Engineering & Design prepared Frenchtown’s first Open Space and Recreation Plan, an optional Master Plan Element that expresses the local municipality’s vision for open space and recreation and provides a framework for implementation. An Open Space and Recreation Plan provides a snapshot of existing conditions and identifies issues and opportunities for passive and active…
-
Foote’s Pond Hydro-raking
New Jersey Society of Municipal Engineers (NJSME) – Project of the Year Award for Municipal Construction Management Projects Foote’s Pond, the centerpiece of a 25-acre natural sanctuary, faced severe environmental challenges after three decades of sediment and vegetation accumulation. This buildup had dramatically impacted the pond’s ecosystem, reducing its original four-foot depth to just 12…
-
Foot Action
Each Footaction location starts with a carefully crafted prototype design, developed to serve as a versatile, site-adaptable concept. This design is then tailored through a comprehensive process that includes due diligence, construction documentation, permitting, and construction administration. Our integrated architecture and design team ensures consistency and efficiency at every stage, streamlining the roll-out from site…
-
Ferring Pharmaceuticals Building Addition
Provided engineering design, landscape architecture services, and construction management for the proposed building addition and realignment of the main entrance drive from Interpace Parkway to the Ferring Pharmaceuticals office building in Parsipanny-Troy Hills. Colliers Engineering & Design professionals coordinated the work closely with the client and the architect during the project, the design of which…
-
Fed Ex Hub – Phase 1 & 2
Colliers Engineering & Design provided structural and geotechnical engineering services for the design of a skewed precast 84-foot long, 24-foot x 8.5-foot single cell culvert with a concrete overlay carrying four lanes of traffic over Catasauqua Creek. The culvert is underlain by Karst geology and is part of the larger Willowbrook Road improvements project associated…
-
US Route 41 FDOT Corridor Survey
Colliers Engineering & Design was recently awarded a Florida Department of Transportation (FDOT) Continuing Service contract for Survey Support in District 7 under Wantman Group Inc. The initial task order involved an updated control survey and topographic design survey for five miles of US Route 41 in Hillsborough County, from Bullfrog Creek to Denver Street….
-
Balligomingo Road Slope Failures
Balligomingo Road in West Conshohocken has been closed since June 2015, after a mudslide spilled debris across the roadway and left the adjoining hillside unstable. Because the location of the area of slope failure that caused the road closure is remote and difficult to access with conventional survey equipment, Colliers Engineering & Design was retained…